AOG

  • Upgrades to 5,000 SF of the facility’s 9,000 SF first floor area
  • New efficient layouts of the Executive Offices and Customer service area to better accommodate the departments and help streamline their operations 
  • New conference room with a catering kitchen in the Executive Suite
  • New, more efficient layout with new modular work stations at the Customer Service area
  • New HVAC system throughout the entire first floor and a new 30-car parking lot.
  • All interior finishes are low VOC materials, with the carpet and ceiling tiles being comprised of 25% recycled materials. 
  • All exterior windows on the first floor were replaced with thermal aluminum frames with tinted, insulated glass for better energy efficiency. 
  • All work was completed in three phases, allowing operations to continue throughout the construction schedule.

Our services included both architecture and interior design.